| Volumes spilled and recovered (bbls) |
| Oil spilled: | Recvrd: | |
| Water spilled: | Recvrd: | |
| Other spilled: 0 | Recved: 0 | |
| GW Impact? Y | Surface water impact? N | Contained within berm? N |
|
| Area and vertical extent of spill: 5-FT X 5 -FT |
| Current land use: O&G PRODUCTION FACILITY/AGRICULTURE |
| Weather conditions: MID 80S |
| Soil/Geology description NUNN LOAM, 0-1% SLOPES |
| Distance in feet to nearest surface water: 500 |
| Depth to shallowest GW: 3 |
| Wetlands: | Buildings: 1300 |
| Livestock: | Water Wells: 910 |
| Cause of spill: |
| EQUIPMENT FAILURE |
| Immediate Response: |
| SEE COMMENTS. |
| Emergency Pits: |
| NA |
| How extent determined: |
| SEE COMMENTS. |
| Further Remediation |
| ~1 CU YD OF IMPACTED SOIL EXCEEDING COGCC TABLE 910-1 CONCENTRATION LEVELS HAS BEEN TRANSPORTED TO THE WASTE MANAGEMENT LANDFILL IN AULT, CO FOR DISPOSAL. PDC IS SCHEDULING FURTHER ASSESSMENT ACTIVITIES TO DETERMINE THE SOURCE OF THE RELEASE AND DELINEATE SOIL AND GROUNDWATER IMPACT AT THE SITE. RESULTS WILL BE SUBMITTED IN A FUTURE FORM 27. |
| Prevent Problem: |
| PDC REPLACED THE LEAKING UNION. |
| Detailed Description: |
| RELEASE OCCURRED AT THE TANK BATTERY RELATED TO TEH MOSER 12-33 (API 123-12545). THE TANK BATTERY IS LOCATED IN THE SWNW OF SEC 33 AS DEPICTED ON FIGURE 1. DURING A SITE INSPECTION, SURFACE STAINING WAS OBSERVED NEAR THE DUMPLINE UNION FROM THE PRODUCTION TANK. FOLLOWING LIMITED EXCAVATION, PDC CONTRACTED LTE TO INVESTIGATE THE SURFACE STAINING. INVESTIGATION RESULTS INDICATED THE SURFACE STAINING WAS MINOR AND SURFICIAL. HOWEVER, HAND AUGER BORINGS INDICATED SUBSURFACE IMPACTS RELATED TO DUMPLINE AND/OR WATER VAULT FAILURE. PDC IS STILL INVESTIGATING THE SOURCE OF THE RELEASE. |